Time: January 6, 2025.
Location: Russia.
Event: On January 6, 2025, CORINMAC’s sand drying production line and palletizing line were delivered to Russia. This is the first delivery in the new year 2025.
Sand drying production line including belt feeder, belt conveyor, burning chamber, three cylinder rotary dryer, draught fan, cyclone dust collector, vibrating screen, and control cabinet, etc. Palletizing line including valve bag packing machine, belt conveyor, bags vibration shaping conveyor, inkjet printer, column palletizer, pallet wrapping machine and control cabinet, etc.
Container loading photos are as follows:
Post time: Jan-08-2025