Time: September 27, 2024.
Location: Navoi, Uzbekistan.
Event: On September 27, 2024, CORINMAC dry mortar production equipment was shipped to Navoi, Uzbekistan.
Equipment including screw conveyor, finished product hopper, automatic packing and palletizing equipment (automatic packing machine, column palletizer, pallet wrapping machine, conveyor, control cabinet) and spare parts, etc.
Container loading photos are as follows:
Post time: Sep-30-2024